LaserBots
  • Home
  • About

Home > Plan

Plan

Project Timeline

Tuesday, 30 October 2012 Category : Phase One Report, Plan 0

Project Timeline

Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Older Posts »
Theme MXS. Powered by Blogger.

Trailer

Contributors

  • Unknown
  • Unknown
  • Unknown

Archives

  • ▼  2013 (18)
    • ▼  January (18)
      • Welcome!
      • LaserBots: User Manual
      • Technical Manual
      • Future Work
      • Problems with Design
      • Project Management
      • Final Demonstration Code
      • Final Build Pictures
      • Games Master GUI
      • Testing Multiple Controllers
      • Improving iPad Interface
      • PCB Design and Manufacture
      • Building a Full Robot
      • Circle Network: Controlling each robot
      • XBee Configuration: Coordinator and Router (Circle...
      • Running Processing on the Raspberry Pi
      • Point to Multipoint - Broadcast Network Design
      • Point to Point Xbee Network Testing
  • ►  2012 (20)
    • ►  December (3)
    • ►  November (6)
    • ►  October (11)

Categories

  • Aiming (2)
  • Comms (10)
  • Design (13)
  • Detection (2)
  • Game (1)
  • Implementation (22)
  • Laser (2)
  • Phase One Report (10)
  • Phase Two (25)
  • Plan (1)
  • User Manual (1)